Project:

Old bank transformation into 4 apartments 
IMG_2154.jpg
Pattern Herst_edited.png
Type of work:
Interesting information:
  1. Demolition of olf bank and clearing the surface area

  2. Installing of chape

  3. Installing electricity

  4. Installing sanitary 

  5. Chape works 

  6. Drywall works 

  7. Laying floortiles

  8. Painting 

  • The water and electricity pipes were installed by cutting a central trench along the surface of the ground in the chapel, as a cost-saving measure. 

Tips & Tricks:
  • Utilize specialized trenching tools to streamline the process, as manual cutting can be both time-consuming and costly.