Project:
Old bank transformation into 4 apartments
Type of work:
Interesting information:
-
Demolition of olf bank and clearing the surface area
-
Installing of chape
-
Installing electricity
-
Installing sanitary
-
Chape works
-
Drywall works
-
Laying floortiles
-
Painting
-
The water and electricity pipes were installed by cutting a central trench along the surface of the ground in the chapel, as a cost-saving measure.
Tips & Tricks:
-
Utilize specialized trenching tools to streamline the process, as manual cutting can be both time-consuming and costly.