Project:

Installation of a mega sliding door
IMG_8994.jpg
Pattern Herst_edited.png
Type of work:
  1. Demolition works

  2. Structural support works

  3. Protection of surfaces

  4. Installation of IPE beam with L-iron fastened to the metal beam

  5. Repairs to the facade after the installation of the metal beam

  6. Supply and installation of sliding door

  7. Air sealing works

Interesting information:
  • Installation of this large sliding door required specialized lifting equipment.

Tips & Tricks:
  • For optimal performance of your newly installed doors and windows, it's essential to use windproofing/airtight sealing tape around the perimeter of the exterior joinery. This ensures better functionality and efficiency of the exterior